Construct Scheme to Second-period of Headquarters Performance Management System in State Grid
- DOI
- 10.2991/iset-15.2015.8How to use a DOI?
- Keywords
- Performance management, Construction scheme, Application integration
- Abstract
In order to enhance the performance management informatics level in State Grid Corporation, as well as strength the cohesion between headquarters performance management and authority work tasks, State Grid Corporation launched the second-period construction of headquarters performance management system. The construction scheme of headquarters performance management is the creed document which guides the overall construction direction. In this paper, we will introduce the overall scheme, deployment architecture, application scenario, along with integration scheme with other business systems. At last, a proof of practice on State Grid Corporation headquarters have been performed, whose positive outcome is presented.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jian Zhang AU - Yan Ma AU - Yan Hou AU - Dongwei Lv AU - Yuwei Yin PY - 2015/03 DA - 2015/03 TI - Construct Scheme to Second-period of Headquarters Performance Management System in State Grid BT - Proceedings of the First International Conference on Information Science and Electronic Technology PB - Atlantis Press SP - 28 EP - 31 SN - 2352-538X UR - https://doi.org/10.2991/iset-15.2015.8 DO - 10.2991/iset-15.2015.8 ID - Zhang2015/03 ER -