The Identification and Prevention of the Risk from EPC Project Owner

Authors
Hui Gao, Xiuhao Ding
Corresponding Author
Hui Gao
Available Online November 2016.
DOI
https://doi.org/10.2991/rac-16.2016.113How to use a DOI?
Keywords
General contractor, EPC project, Risk from owner, Risk management
Abstract
As EPC mode is widely used in the large engineering projects and the engineering general contracting market competition is increasingly fierce, contract with own capital and party a-supplied materials has become the important characteristic of EPC project. From the perspective of general contractor, the risks from the owner gradually become the most challenging issue of many risk factors in the process of project construction. Based on project management theory and risk management process, this research aims to identify and measure the risk factors from the owner, and put forward countermeasures to provide scientific risk management basis for EPC project.
Open Access
This is an open access article distributed under the CC BY-NC license.

Download article (PDF)

Proceedings
7th Annual Meeting of Risk Analysis Council of China Association for Disaster Prevention (RAC-2016)
Publication Date
November 2016
ISBN
978-94-6252-242-8
DOI
https://doi.org/10.2991/rac-16.2016.113How to use a DOI?
Open Access
This is an open access article distributed under the CC BY-NC license.

Cite this article

TY  - CONF
AU  - Hui Gao
AU  - Xiuhao Ding
PY  - 2016/11
DA  - 2016/11
TI  - The Identification and Prevention of the Risk from EPC Project Owner
BT  - 7th Annual Meeting of Risk Analysis Council of China Association for Disaster Prevention (RAC-2016)
PB  - Atlantis Press
UR  - https://doi.org/10.2991/rac-16.2016.113
DO  - https://doi.org/10.2991/rac-16.2016.113
ID  - Gao2016/11
ER  -