Two-Layers CE Algorithm for Flexible Job Shop Scheduling Problem with Electric Power Cost Considered
Authors
G.R. Wang, Q.Q. Li
Corresponding Author
G.R. Wang
Available Online November 2015.
- DOI
- 10.2991/itms-15.2015.103How to use a DOI?
- Keywords
- Cross entropy; FJSP; Scheduling; Electric power co
- Abstract
Propose a Two-Layers CE algorithm to solve flexible job shop scheduling problem. Two optimal objectives are considered: makespan and electric power cost. Analyze the influence of different values of the weight vector to the two objectives. Different simulation instances with different problem scale are devised to validate the superior performance of the algorithm.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - G.R. Wang AU - Q.Q. Li PY - 2015/11 DA - 2015/11 TI - Two-Layers CE Algorithm for Flexible Job Shop Scheduling Problem with Electric Power Cost Considered BT - Proceedings of the 2015 International Conference on Industrial Technology and Management Science PB - Atlantis Press SP - 432 EP - 435 SN - 2352-538X UR - https://doi.org/10.2991/itms-15.2015.103 DO - 10.2991/itms-15.2015.103 ID - Wang2015/11 ER -