A study of construction management of seismic isolation retrofit
- DOI
- 10.2991/icsmme-15.2015.17How to use a DOI?
- Keywords
- Seismic Isolation Retrofit, Basic Seismic Isolation, Temporary Pile, Ground, Vertical Displacement
- Abstract
This study elaborated the process management and quality control of three typical major isolation retrofit projects in the construction stage of base seismic isolation by migrating the building load entrusted by the temporary pile to seismic isolation devices. About the process management, support ground depth was set as a parameter, the process period including the building area and building load were discussed. In the quality control, the impact on the process was generated by the difference of the vertical displacement of load migration and temporary supporting piles properties. The purpose of this study was to analyze the impact of the construction by applying temporary pile in the construction process of seismic isolation devices.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xuewen Bao AU - Yasuhide Mochida AU - Yukihito Nanbu PY - 2015/11 DA - 2015/11 TI - A study of construction management of seismic isolation retrofit BT - Proceedings of the 2015 International Conference on Structural, Mechanical and Material Engineering PB - Atlantis Press SP - 70 EP - 75 SN - 2352-5401 UR - https://doi.org/10.2991/icsmme-15.2015.17 DO - 10.2991/icsmme-15.2015.17 ID - Bao2015/11 ER -