Water Pollution Risk Assessment for Water Transfer Projects
Authors
Lan-Lan Song, Jian-Yun Zhang
Corresponding Author
Lan-Lan Song
Available Online December 2016.
- DOI
- 10.2991/icsd-16.2017.17How to use a DOI?
- Keywords
- water transfer project, triangular fuzzy number, -cut technique, water pollution risk, Taihu Basin
- Abstract
Due to the imprecision of water environmental system and the repeated scarcity of quantitative information during transfer project, fuzzy theory might be an effective tool of the water pollution risk evaluation. Firstly, triangular fuzzy numbers of environmental parameters were defined. Then, fuzzy -cut technique is introduced to figure out the fuzzy expected values. Based on the concept of fuzzy reliability of "recipient" water quality, the water pollution risk in fuzzy terms is calculated. Finally, the implementation process of the water risk assessment method is explained by the case study.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Lan-Lan Song AU - Jian-Yun Zhang PY - 2016/12 DA - 2016/12 TI - Water Pollution Risk Assessment for Water Transfer Projects BT - Proceedings of the 2nd 2016 International Conference on Sustainable Development (ICSD 2016) PB - Atlantis Press SP - 85 EP - 89 SN - 2352-5401 UR - https://doi.org/10.2991/icsd-16.2017.17 DO - 10.2991/icsd-16.2017.17 ID - Song2016/12 ER -