Proceedings of the6th International Conference on Mechatronics, Materials, Biotechnology and Environment (ICMMBE 2016)

Research on the typical mechanical configuration scheme of the whole mechanical construction of overhead transmission lines in plain area

Authors
Guang Rui Tang, Ming Jiang, Chen Liu, Ya Ao Zhou, Yong Ma
Corresponding Author
Guang Rui Tang
Available Online September 2016.
DOI
10.2991/icmmbe-16.2016.57How to use a DOI?
Keywords
plain area, transmission lines, mechanical construction, machinery allocation
Abstract

With the development of economy and technology, the new technology, new methods and new equipment are used in the construction of overhead transmission line. Currently, the part of the construction organizations lack cognition to this kind of new technology and new methods. Instead of, they rely more on experience to allocate construction equipment arbitrarily, which lead to the less use of the new technology and new equipment. At the same time, the construction organizations are lack of effective and standardized construction machinery allocation scheme of. overhead transmission lines. Plain area is a suitable terrain for the implementation of whole process mechanization because the open terrain is suitable for transitions of large-scale machinery and equipment. What's more, large area of road and bridge and it has high construction efficiency, low cost and obvious effect. This paper has researched on the typical mechanical configuration scheme of the whole mechanical construction of overhead transmission lines in plain area, which including seven processes.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the6th International Conference on Mechatronics, Materials, Biotechnology and Environment (ICMMBE 2016)
Series
Advances in Engineering Research
Publication Date
September 2016
ISBN
10.2991/icmmbe-16.2016.57
ISSN
2352-5401
DOI
10.2991/icmmbe-16.2016.57How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Guang Rui Tang
AU  - Ming Jiang
AU  - Chen Liu
AU  - Ya Ao Zhou
AU  - Yong Ma
PY  - 2016/09
DA  - 2016/09
TI  - Research on the typical mechanical configuration scheme of the whole mechanical construction of overhead transmission lines in plain area
BT  - Proceedings of the6th International Conference on Mechatronics, Materials, Biotechnology and Environment (ICMMBE 2016)
PB  - Atlantis Press
SP  - 293
EP  - 298
SN  - 2352-5401
UR  - https://doi.org/10.2991/icmmbe-16.2016.57
DO  - 10.2991/icmmbe-16.2016.57
ID  - Tang2016/09
ER  -