Research on the risk assessment method of power grid engineering cost based on grey correlation analysis

Authors
Huiling Zhang1, Feifei Wang1, Kunlun Wang1, *
1State Grid Xinjiang Electric Power Co., Ltd, Uygur Autonomous Region Urumqi, Wulumuqi, Xinjiang, 830011, China
*Corresponding author. Email: juzen123@163.com
Corresponding Author
Kunlun Wang
Available Online 11 December 2023.
DOI
10.2991/978-94-6463-308-5_22How to use a DOI?
Keywords
power grid engineering; cost management; deviation analysis; control effect; evaluation method; optimization suggestions
Abstract

Power grid engineering is an organic component of national infrastructure, which provides strong support for national economic and social development, and cost control is one of the core contents of power grid engineering construction, which has an important impact on the investment efficiency of power grid engineering. Based on practical factors such as large investment scale, complex procurement plan, and long construction period, power grid engineering cost control faces certain challenges and pressures. Especially under the urgent need to reduce cost and improve accuracy in power grid engineering construction, it is necessary to analyze the relevant factors that lead to cost deviation, explore ideas and methods to optimize power grid engineering cost management, and effectively improve management effectiveness as well as the cost management level of power grid engineering. Therefore, combined with the needs of power grid engineering cost control and control, this paper constructs a cost risk assessment index system from five dimensions: technology, management, policy, economy, and natural environment, and constructs a risk assessment model based on analytic hierarchy-entropy weight method-grey management analysis, which provides a reference for power grid enterprises to carry out engineering cost risk assessment reasonably.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2023 8th International Conference on Engineering Management (ICEM 2023)
Series
Atlantis Highlights in Engineering
Publication Date
11 December 2023
ISBN
10.2991/978-94-6463-308-5_22
ISSN
2589-4943
DOI
10.2991/978-94-6463-308-5_22How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Huiling Zhang
AU  - Feifei Wang
AU  - Kunlun Wang
PY  - 2023
DA  - 2023/12/11
TI  - Research on the risk assessment method of power grid engineering cost based on grey correlation analysis
BT  - Proceedings of the 2023 8th International Conference on Engineering Management (ICEM 2023)
PB  - Atlantis Press
SP  - 207
EP  - 214
SN  - 2589-4943
UR  - https://doi.org/10.2991/978-94-6463-308-5_22
DO  - 10.2991/978-94-6463-308-5_22
ID  - Zhang2023
ER  -