Study on the Movement Law of Overburden Strata During Mining Strip Pillar with Paste
Authors
Weijia Guo, Yangyang Li, Baoliang Zhang, Hailong Wang, Xizhen Sun
Corresponding Author
Weijia Guo
Available Online October 2014.
- DOI
- 10.2991/mining-14.2014.7How to use a DOI?
- Keywords
- paste filling mining, similar material simulation, filling rate, strip pillar, overburden strata movement.
- Abstract
The movement law of overburden strata in backfill mining face was studied, by the method of similar material simulation, on the background of the paste filling mining in Daizhuang Coal Mine, and in consideration of change of filling body strength with time. The results showed that the immediate roof by caving method can be converted to basic roof by full mining and full backfill, and they can keep force transfer in advance direction. The roof structure of “coal pillar-coal wall” became the roof structure of “coal pillar-filling body-coal wall” in the process of fill mining, which can control mining subsidence effectively.
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Weijia Guo AU - Yangyang Li AU - Baoliang Zhang AU - Hailong Wang AU - Xizhen Sun PY - 2014/10 DA - 2014/10 TI - Study on the Movement Law of Overburden Strata During Mining Strip Pillar with Paste BT - Proceedings of the Taishan Academic Forum – Project on Mine Disaster Prevention and Control PB - Atlantis Press SP - 38 EP - 43 SN - 2352-5401 UR - https://doi.org/10.2991/mining-14.2014.7 DO - 10.2991/mining-14.2014.7 ID - Guo2014/10 ER -