Proceedings of the 2016 International Forum on Management, Education and Information Technology Application

Capacitated Multi-item joint Procurement Models with Outsourcing and Backlogging

Authors
Jinhong Zhong, Yong Wang, Xiaofei Yu
Corresponding Author
Jinhong Zhong
Available Online January 2016.
DOI
10.2991/ifmeita-16.2016.186How to use a DOI?
Keywords
Multi-item dynamic lot-sizing problem; Outsourcing; Backlogging; Budget restriction
Abstract

This paper addresses a multi-item joint procurement lot-sizing problem with limited budget, outsourcing, and backlogging, where product-dependent minor setup cost and major setup cost are considered. We build four models and code Lingo-based simulation scripts. By the comparative experiments, we find that backlogging and outsourcing policies can reduce the system total cost.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 International Forum on Management, Education and Information Technology Application
Series
Advances in Social Science, Education and Humanities Research
Publication Date
January 2016
ISBN
10.2991/ifmeita-16.2016.186
ISSN
2352-5398
DOI
10.2991/ifmeita-16.2016.186How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Jinhong Zhong
AU  - Yong Wang
AU  - Xiaofei Yu
PY  - 2016/01
DA  - 2016/01
TI  - Capacitated Multi-item joint Procurement Models with Outsourcing and Backlogging
BT  - Proceedings of the 2016 International Forum on Management, Education and Information Technology Application
PB  - Atlantis Press
SP  - 1021
EP  - 1028
SN  - 2352-5398
UR  - https://doi.org/10.2991/ifmeita-16.2016.186
DO  - 10.2991/ifmeita-16.2016.186
ID  - Zhong2016/01
ER  -