Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023)

Project Cost Management Under Contingency: An Effective Path Analysis of Fuzzy Set Qualitative Comparative Analysis

Authors
Rujin Liao1, Jing Zhang1, Ruwen Tan1, Yilin Wu1, Minjiu Yu1, *
1College of Architecture and Environment, Sichuan University, Chengdu, 610065, China
*Corresponding author. Email: yuminjiu@scu.edu.cn
Corresponding Author
Minjiu Yu
Available Online 9 October 2023.
DOI
10.2991/978-94-6463-256-9_172How to use a DOI?
Keywords
Risk Project Cost Management; fsQCA; Configuration Analysis
Abstract

Construction projects under contingency are characterized by high uncertainty and difficulty in cost control. This study aims to analyze the impact of uncertainty on project cost management under contingency. By reviewing related literature, the influencing factors of construction cost management are identified. Cost data were collected for 6 projects under construction affected by COVID-19 from 2020 to 2022. On this basis, an analytical evaluation of the effective path for construction projects was performed using the fuzzy set qualitative comparative analysis (fsQCA) method to evaluate the influence of antecedent variables on explanatory variables in the combined state, which helps construction contractors to find solutions to cost management problems in unexpected situations. The result is valid non-Boolean configuration paths.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023)
Series
Advances in Economics, Business and Management Research
Publication Date
9 October 2023
ISBN
978-94-6463-256-9
ISSN
2352-5428
DOI
10.2991/978-94-6463-256-9_172How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Rujin Liao
AU  - Jing Zhang
AU  - Ruwen Tan
AU  - Yilin Wu
AU  - Minjiu Yu
PY  - 2023
DA  - 2023/10/09
TI  - Project Cost Management Under Contingency: An Effective Path Analysis of Fuzzy Set Qualitative Comparative Analysis
BT  - Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023)
PB  - Atlantis Press
SP  - 1692
EP  - 1704
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-256-9_172
DO  - 10.2991/978-94-6463-256-9_172
ID  - Liao2023
ER  -