The Review of Construction Technologies Using Fuzzy-Ball Workover Fluid in Well C22 and Well F20 of SZ36-1 Offshore Oilfield
- DOI
- 10.2991/icmsa-15.2015.146How to use a DOI?
- Keywords
- Workover Fluid, Fuzzy-Ball, Construction Technology.
- Abstract
SZ36-1 oil field is an offshore oilfield with serious lost circulation as well as formation damage. To avoid lost circulation and formation damage during workover in offshore oil fields, a novel multi-functional Fuzzy-Ball Workover Fluid (FBWF) was developed and used in well C22 and well F20 of SZ36-1 oil field. In this article, we review the construction technologies using FBWF in two wells, which include preparation, injecting, flowing back. By contrasting the construction technologies in two wells, we conclude some experiences in construction technologies for offshore oilfield workover using FBWF. These achievements can also help the followers while using FBWF in offshore oilfield workover.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Shan Wang AU - Yao Liu AU - Jian-Hua Bai AU - Xin Meng AU - Jian Song PY - 2014/06 DA - 2014/06 TI - The Review of Construction Technologies Using Fuzzy-Ball Workover Fluid in Well C22 and Well F20 of SZ36-1 Offshore Oilfield BT - Proceedings of the 2015 International Conference on Material Science and Applications PB - Atlantis Press SP - 799 EP - 803 SN - 2352-541X UR - https://doi.org/10.2991/icmsa-15.2015.146 DO - 10.2991/icmsa-15.2015.146 ID - Wang2014/06 ER -