The Innovative Structural Measures about the Temperature Late-poured Band and Construction Joints in the Underground Structure of Tall Building
- DOI
- 10.2991/icmmse-16.2016.2How to use a DOI?
- Keywords
- The late-poured band of basement, The construction joints, The steel water-stop strip, The structural measures
- Abstract
With the development of tall building, the requirements for the structural design and construction of building becomes higher and higher, especially the design of the late-poured band in underground structure and the construction measures in the projects. In this paper, taking a high-rise frame structure engineering as an example in Yanji Jilin, combines with the theoretical knowledge and experience of construction, it analyses the problems during the design and construction of the late-poured band in basement, and finally proposes the innovative structural measures about the temperature late-poured band and construction joints in the underground structure of high-rise building. Testified by the practice, the construction quality meets the requirements of specification acceptance standard, so this approach can be applied to similar project.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Guangxiu Fang PY - 2016/03 DA - 2016/03 TI - The Innovative Structural Measures about the Temperature Late-poured Band and Construction Joints in the Underground Structure of Tall Building BT - Proceedings of the 2016 International Conference on Mechanics, Materials and Structural Engineering PB - Atlantis Press SP - 7 EP - 11 SN - 2352-5401 UR - https://doi.org/10.2991/icmmse-16.2016.2 DO - 10.2991/icmmse-16.2016.2 ID - Fang2016/03 ER -