Rebuilding the Kariba Dam
Authors
Xiaoyu Zhu
Corresponding Author
Xiaoyu Zhu
Available Online September 2017.
- DOI
- 10.2991/icmmcce-17.2017.98How to use a DOI?
- Keywords
- Rebuild; Construction model; Demolition cost.
- Abstract
The costs of rebuilding the Kariba Dam consist of demolition costs and construction costs. To evaluate the costs of reconstruction, we set up a model. In this model, partial least-squares regression analysis is carried out on the known construction costs of different dams through different periods. Then choose the dominant cost option from the model to establish the regression equation. Eventually, use the model to calculate the construction cost, and then according to the calculated construction cost, estimate the demolition cost.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xiaoyu Zhu PY - 2017/09 DA - 2017/09 TI - Rebuilding the Kariba Dam BT - Proceedings of the 2017 5th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering (ICMMCCE 2017) PB - Atlantis Press SP - 525 EP - 527 SN - 2352-5401 UR - https://doi.org/10.2991/icmmcce-17.2017.98 DO - 10.2991/icmmcce-17.2017.98 ID - Zhu2017/09 ER -