Proceedings of the 2017 5th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering (ICMMCCE 2017)

Rebuilding the Kariba Dam

Authors
Xiaoyu Zhu
Corresponding Author
Xiaoyu Zhu
Available Online September 2017.
DOI
10.2991/icmmcce-17.2017.98How to use a DOI?
Keywords
Rebuild; Construction model; Demolition cost.
Abstract

The costs of rebuilding the Kariba Dam consist of demolition costs and construction costs. To evaluate the costs of reconstruction, we set up a model. In this model, partial least-squares regression analysis is carried out on the known construction costs of different dams through different periods. Then choose the dominant cost option from the model to establish the regression equation. Eventually, use the model to calculate the construction cost, and then according to the calculated construction cost, estimate the demolition cost.

Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2017 5th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering (ICMMCCE 2017)
Series
Advances in Engineering Research
Publication Date
September 2017
ISBN
978-94-6252-381-4
ISSN
2352-5401
DOI
10.2991/icmmcce-17.2017.98How to use a DOI?
Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Xiaoyu Zhu
PY  - 2017/09
DA  - 2017/09
TI  - Rebuilding the Kariba Dam
BT  - Proceedings of the 2017 5th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering (ICMMCCE 2017)
PB  - Atlantis Press
SP  - 525
EP  - 527
SN  - 2352-5401
UR  - https://doi.org/10.2991/icmmcce-17.2017.98
DO  - 10.2991/icmmcce-17.2017.98
ID  - Zhu2017/09
ER  -