The Application of Monitor Measurement Technology in Newly-built Lanzhou-Chongqing Railway Tao Shuping Tunnel 4 slope
- DOI
- 10.2991/assehr.k.201214.560How to use a DOI?
- Keywords
- Monitoring Measurement technology, Tao Shu Ping Tunnel, Tunnel Construction
- Abstract
Monitoring Measurement technology, which plays an important role in the process of tunnel construction, supervises the deforming process and developing trend of tunnel surrounding rock. It monitors the settlement of vault and peripheral convergence of Tao Shu Ping Tunnel’s fourth slope in real-time. Based on the analyses of the data, the stability of surrounding rock is available. Furthermore, by guiding the on-site construction, serious accident can be successfully avoided. Undoubtedly, the monitoring measurement technology has a certain guiding significance not only on the anaphase construction of Tao Shu Ping Tunnel but also some similar tunnels.
- Copyright
- © 2020, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - BoLun Wei PY - 2020 DA - 2020/12/16 TI - The Application of Monitor Measurement Technology in Newly-built Lanzhou-Chongqing Railway Tao Shuping Tunnel 4 slope BT - Proceedings of the 2020 3rd International Conference on Humanities Education and Social Sciences (ICHESS 2020) PB - Atlantis Press SP - 543 EP - 546 SN - 2352-5398 UR - https://doi.org/10.2991/assehr.k.201214.560 DO - 10.2991/assehr.k.201214.560 ID - Wei2020 ER -