Proceedings of the International Conference on Applied Science and Technology on Engineering Science 2023 (iCAST-ES 2023)

Performance of Prefabricated Vertical Drain Using Triangular Pattern for Soft Soil on Sigli Banda Aceh Toll Road

Authors
Liliwarti Liliwarti1, *, Dwina Archenita1, Silvia Nengsih1, Afrianto Khairil Rizal Amri1, Muhammad Ramadi1
1Civil Engineering Department, Politeknik Negeri Padang, Padang, Indonesia
*Corresponding author. Email: liliwarti@pnp.ac.id
Corresponding Author
Liliwarti Liliwarti
Available Online 17 February 2024.
DOI
10.2991/978-94-6463-364-1_38How to use a DOI?
Keywords
consolidation; settlement; preloading; PVD
Abstract

The Sigli - Banda Aceh Toll Road passes through an area where the subgrade consists of soft soil. Geotechnical issues usually arise that settlement over a relatively extended period, which can damage the structure constructed above it. One of the improvement methods for soft soil problems is a Prefabricated Vertical Drain. The result of consolidation settlement takes a very long time, 21.7 years. Therefore, soil improvement is required beforehand using the Preloading method in combination with Prefabricated Vertical Drain. A prefabricated vertical drain will be paired up to a depth of 8 meters. The installation pattern used is a triangular pattern from 1 meter, 1.25 meters, 1.5 meters, 1.75 meters, and 2 meters. Based on analytical calculations, it can be concluded that the embankment construction process must be carried out step by step, and the construction speed is limited and using installation distance of 1 meter requires 57 days, an installation distance of 1.25 meters requires 80 days, an installation distance of 1.5 meters requires 118 days, an installation distance of 1.75 meters requires 160 days, and an installation distance of 2 meters requires 211 days to achieve a consolidation degree of 90 percent. So, a greater installation distance.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the International Conference on Applied Science and Technology on Engineering Science 2023 (iCAST-ES 2023)
Series
Advances in Engineering Research
Publication Date
17 February 2024
ISBN
10.2991/978-94-6463-364-1_38
ISSN
2352-5401
DOI
10.2991/978-94-6463-364-1_38How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Liliwarti Liliwarti
AU  - Dwina Archenita
AU  - Silvia Nengsih
AU  - Afrianto Khairil Rizal Amri
AU  - Muhammad Ramadi
PY  - 2024
DA  - 2024/02/17
TI  - Performance of Prefabricated Vertical Drain Using Triangular Pattern for Soft Soil on Sigli Banda Aceh Toll Road
BT  - Proceedings of the International Conference on Applied Science and Technology on Engineering Science 2023 (iCAST-ES 2023)
PB  - Atlantis Press
SP  - 396
EP  - 407
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-364-1_38
DO  - 10.2991/978-94-6463-364-1_38
ID  - Liliwarti2024
ER  -