Stability Analysis on Dam Banks of the Jiangjia Control Project in the Jinan Yellow River
- DOI
- 10.2991/978-94-6463-336-8_20How to use a DOI?
- Keywords
- Yellow River; Jiangjia; control project; dam bank; stability analysis
- Abstract
Many dam banks of the Yellow River downstream control projects have not been reinforced due to the limitation of project scale and investment, which is a hidden danger affecting flood control safety. Based on the field survey of the dam banks of the Jiangjia Control Project, the stability was analyzed for the dam banks of the project, and suggestions were made for reinforcement of the dam banks of control projects. The results showed that the outer slope ratio was designed to be 1: 1.5 for the dam bank of the Jiangjia Control Project. However, the current minimal slope ratio was 1: 1.2, which was less than the design value. 94.7% of the slope ratio did not meet the standard. The maximal thickness of the flat stone body was 0.2 m, which was much less than the design value of 1.11 m. The flat stone body was thin. 81.25% of the weight did not meet the standard. The percentage of missing flat stone bodies was 81% in the estimated section, and the stability of the dam bank was significantly reduced for the control project. Thus, the results can provide technical support for the comprehensive management of the Yellow River in Jinan.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Min Zhang AU - Xizhong Shen AU - Fan Zhang AU - Chenghui Dong AU - Yan Lan AU - Haoming Yang PY - 2023 DA - 2023/12/30 TI - Stability Analysis on Dam Banks of the Jiangjia Control Project in the Jinan Yellow River BT - Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023) PB - Atlantis Press SP - 178 EP - 185 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-336-8_20 DO - 10.2991/978-94-6463-336-8_20 ID - Zhang2023 ER -