Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023)

Deformation of an existing metro station attachment structure under the influence of adjacent construction of a covered excavation pit

Authors
Qingmeng Shen1, 2, Zhaotai Zhang1, Chunqing Fu1, Wenhui Ma1, Zhiwei Yang3, Min Yang1, *, Weihua Yang1, Jinpin Zou1
1Beijing Urban Construction Design & Development Group Co., Ltd, Beijing, 100032, China
2China University of Mining and Technology (Beijing), Beijing, 100083, China
3Kunming Survey, Design and Research Institute Co., Ltd, Kunming, 650000, China
*Corresponding author. Email: yangmin@bjucd.com
Corresponding Author
Min Yang
Available Online 30 December 2023.
DOI
10.2991/978-94-6463-336-8_14How to use a DOI?
Keywords
Pit construction; Metro station; Attachment structure; Numerical simulation; Deformation law
Abstract

The existing metro station buildings closest to the cover excavation pit will inevitably be more damaged as a result of pit construction. A three-dimensional finite element model was created using ANSYS software based on a deep foundation pit adjacent to an existing metro station in Beijing to simulate the cover excavation pit construction process and discuss the impact of the pit construction process on the deformation of the attachment structures of the existing station. The distance between the existing structure and the new pit, as well as the shape of the existing structure and the connection between the attachment structure and the main station, all play a role in how much the existing station attachment structure is impacted by the tendency to sink during pit construction.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023)
Series
Advances in Engineering Research
Publication Date
30 December 2023
ISBN
10.2991/978-94-6463-336-8_14
ISSN
2352-5401
DOI
10.2991/978-94-6463-336-8_14How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Qingmeng Shen
AU  - Zhaotai Zhang
AU  - Chunqing Fu
AU  - Wenhui Ma
AU  - Zhiwei Yang
AU  - Min Yang
AU  - Weihua Yang
AU  - Jinpin Zou
PY  - 2023
DA  - 2023/12/30
TI  - Deformation of an existing metro station attachment structure under the influence of adjacent construction of a covered excavation pit
BT  - Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023)
PB  - Atlantis Press
SP  - 116
EP  - 127
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-336-8_14
DO  - 10.2991/978-94-6463-336-8_14
ID  - Shen2023
ER  -