Analysis and Policy Recommendations for New Energy Overcapacity Problem in China-- Wind and Solar Energy Industry as Example
- DOI
- 10.2991/emim-16.2016.274How to use a DOI?
- Keywords
- New energy; Overcapacity; Wind energy; Solar energy
- Abstract
In recent years, part of the new energy industry in China has appeared a certain degree of excess capacity. This problem causes the bottleneck phenomenon, including the mismatch both wind farm construction and power grid construction, lacking the ability to form a complete set of grid, new energy prices not reacting to its positive externalities, there is also a new energy enterprise technical level which is not high in China, local governments in the achievement of new energy driven by the reason of excessive investment, etc. Aiming at the existence of these temporary short-term problems, this paper also puts forward the corresponding policy recommendations.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Tingfa Zhang AU - Peng Sun AU - Weishuang Xu PY - 2016/04 DA - 2016/04 TI - Analysis and Policy Recommendations for New Energy Overcapacity Problem in China-- Wind and Solar Energy Industry as Example BT - Proceedings of the 6th International Conference on Electronic, Mechanical, Information and Management Society PB - Atlantis Press SP - 1345 EP - 1349 SN - 2352-538X UR - https://doi.org/10.2991/emim-16.2016.274 DO - 10.2991/emim-16.2016.274 ID - Zhang2016/04 ER -