Research on Fuzzy Comprehensive Evaluation of Transmission and Transformation Project Based on Analytic Hierarchy Process
- DOI
- 10.2991/emcs-17.2017.61How to use a DOI?
- Keywords
- Power transmission engineering; Analytic hierarchy process; Index system; Weight; Fuzzy comprehensive evaluation
- Abstract
The establishment of a power transmission project needs to take into account the technical, economic and social benefits and so on, these factors affect each other, which is difficult to accurately distinguish and define. In this context, a method of combining AHP and fuzzy comprehensive evaluation is proposed. Firstly, the evaluation index system is established, and the weight of each evaluation factor is determined by AHP. Then, the fuzzy comprehensive evaluation model based on AHP is constructed to carry on the comprehensive evaluation and analysis. Finally, The application of the example in the substation project confirms that the model is scientific and feasible.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Shuliang Liu AU - Yijing Liang PY - 2017/03 DA - 2017/03 TI - Research on Fuzzy Comprehensive Evaluation of Transmission and Transformation Project Based on Analytic Hierarchy Process BT - Proceedings of the 2017 7th International Conference on Education, Management, Computer and Society (EMCS 2017) PB - Atlantis Press SP - 303 EP - 313 SN - 2352-538X UR - https://doi.org/10.2991/emcs-17.2017.61 DO - 10.2991/emcs-17.2017.61 ID - Liu2017/03 ER -