- Abstract
The filling process and construction technology of wind-blown sand subgrade were explained aiming at emphasis and difficulties of railway engineering, combining with special construction condition of wind-blown sand filling subgrade, the results pointed out that wind-blown sand subgrade construction technology using sprinkling and vibration roller rolling solved the compaction problem of wind-blown sand subgrade, and ensured construction quality.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xiaofang Li AU - Shidan He AU - Weiling Teng PY - 2016/01 DA - 2016/01 TI - The Construction Technology of Wind Blown Sand Fill Subgrade BT - Proceedings of the 2016 International Conference on Education, Management, Computer and Society PB - Atlantis Press SP - 334 EP - 337 SN - 2352-538X UR - https://doi.org/10.2991/emcs-16.2016.80 DO - 10.2991/emcs-16.2016.80 ID - Li2016/01 ER -