Identification of Standard Times to Determine Production Capacity: A Case Study
- DOI
- 10.2991/978-94-6463-618-5_20How to use a DOI?
- Keywords
- standard times; production capacity; time study
- Abstract
PT XYZ is one of the companies in Bandung engaged in the textile industry. The company’s principal product is a plain T-shirt. The issue at PT XYZ is that the production capacity of plain T-shirts is not clearly defined, resulting in inconsistency and inaccuracy in production time. This, in turn, leads to delivery times that do not align with the agreed customer expectations. This research employs a quantitative methodology with a time study approach, to calculate the standard time, determine the production capacity of plain T-shirts, and formulate recommendations to enhance production capacity. The total standard time for each production process can be identified. The standard time is divided by the number of operators, resulting in the system cycle time. The system cycle time for the production of plain T-shirt A allows for the calculation of a capacity of 86 units per hour, while plain T-shirt B has a capacity of 101 units per hour. The research findings indicate that the total standard time required to produce one unit of plain T-shirt A is 398,54 s, and 412,63 s for plain T-shirt B. The production capacity of plain T-shirt A is 689 units per day, while that of plain T-shirt B is 810 units per day. Recommendations to increase capacity can be made in two ways: by adding operators or by increasing working hours.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Sabiqul C. R. Ramadhan AU - Verani Hartati PY - 2024 DA - 2024/12/29 TI - Identification of Standard Times to Determine Production Capacity: A Case Study BT - Proceedings of the Widyatama International Conference on Engineering 2024 (WICOENG 2024) PB - Atlantis Press SP - 184 EP - 191 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-618-5_20 DO - 10.2991/978-94-6463-618-5_20 ID - Ramadhan2024 ER -