Cost Management of Power Engineering Projects based on BIM Life Cycle
- DOI
- 10.2991/ssmi-18.2019.34How to use a DOI?
- Keywords
- BIM; Full life cycle; Power engineering; Cost management; Engineering quantity calculation.
- Abstract
The whole life cycle cost management of power engineering refers to the enterprise considering the problem from the perspective of cost and cost, and scientifically controlling and controlling the project investment funds. The whole cycle of the project is characterized by a wide range of management and control, and a large time span. Due to the fact that the power engineering has a progress forecast and the cost management is not scientific enough, the system is poor, and the accuracy is low, there is a deviation between the cost management and the various progress control nodes. For this reason, the BIM technology is applied, and the cost simulation is carried out. Demonstrate the feasibility of the construction organization plan and calculate the quantity of the project to show the relationship between the cost and the progress more intuitively and clearly. On this basis, a more scientific, accurate and effective life cycle cost management of power engineering is realized.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Lu Liu AU - Liang Shang PY - 2019/02 DA - 2019/02 TI - Cost Management of Power Engineering Projects based on BIM Life Cycle BT - Proceedings of the 2018 International Symposium on Social Science and Management Innovation (SSMI 2018) PB - Atlantis Press SP - 192 EP - 197 SN - 2352-5428 UR - https://doi.org/10.2991/ssmi-18.2019.34 DO - 10.2991/ssmi-18.2019.34 ID - Liu2019/02 ER -