Optimization of Seamless Steel Tube Order Planning Based on Capacity Balance
Authors
Sujian Li, Jinchao Yang
Corresponding Author
Sujian Li
Available Online April 2019.
- DOI
- 10.2991/smont-19.2019.28How to use a DOI?
- Keywords
- seamless steel tube; production balance; order planning; IGA-VNS
- Abstract
The production process of seamless steel tube is divided into four production stages of preparation, perforation and hot rolling, cold drawing and finishing, and the order planning model is established by taking five-days as the unit of time. The mixed variable neighborhood improved genetic algorithm is designed to solve the model, which makes the order planning more effective to guide the production planning.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Sujian Li AU - Jinchao Yang PY - 2019/04 DA - 2019/04 TI - Optimization of Seamless Steel Tube Order Planning Based on Capacity Balance BT - Proceedings of the 2019 International Conference on Modeling, Simulation, Optimization and Numerical Techniques (SMONT 2019) PB - Atlantis Press SP - 126 EP - 132 SN - 1951-6851 UR - https://doi.org/10.2991/smont-19.2019.28 DO - 10.2991/smont-19.2019.28 ID - Li2019/04 ER -