Research on Planning of Multi Vehicle Series Line Based on AGV Adaptive Internal Circulation
- DOI
- 10.2991/978-94-6463-200-2_98How to use a DOI?
- Keywords
- AGV internal cycle; flexible production; fast switching; vehicle model delivery
- Abstract
Different from the traditional linear welding production line, the AGV internal circulation welding production line proposed in this paper mainly drives the AGV fixture and BIW products to realize the process transfer through the AGV in the region. The purpose is to build a welding production line that can accommodate the simultaneous on-line production of four vehicle series and the subsequent integration of N vehicle series, so as to meet the flexible and rapid switching of multiple vehicle series of 60jph. In order to realize the above functions, the fixture three-dimensional warehouse and AGV in the welding production line are introduced for the first time, the switching production of four vehicle series is realized by AGV traction AGV fixture and three-dimensional warehouse inventory fixture switching, and the NC servo system is introduced to realize cross-scale vehicle series positioning, so as to ensure that different vehicle series can realize positioning based on the same ground positioning system.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Yumeng Du AU - Lei Dong AU - Yiwen Zhang AU - Yan Gao AU - Zhenhui Li AU - Zengyu Lin AU - Xiaofeng Wang AU - Jingru Liu AU - Hainan Li AU - Guoxin Song PY - 2023 DA - 2023/07/26 TI - Research on Planning of Multi Vehicle Series Line Based on AGV Adaptive Internal Circulation BT - Proceedings of the 2023 3rd International Conference on Public Management and Intelligent Society (PMIS 2023) PB - Atlantis Press SP - 946 EP - 952 SN - 2589-4919 UR - https://doi.org/10.2991/978-94-6463-200-2_98 DO - 10.2991/978-94-6463-200-2_98 ID - Du2023 ER -