Proceedings of the 2015 4th National Conference on Electrical, Electronics and Computer Engineering

Rapid Testing Method of New Generation Smart Substation Network Configuration

Authors
Wang Lei, Li Jin
Corresponding Author
Wang Lei
Available Online December 2015.
DOI
10.2991/nceece-15.2016.69How to use a DOI?
Keywords
New Generation Smart Substation; Network Configuration; Testing
Abstract

A number of popular communication traffic control protocols including virtual local area network and GMRP are applied in the new generation Smart Substation internal communication network. This paper presents a black-box testing method which does not rely on specific network configuration profile that can hopefully simplify testing requirements, and to meet the demands of smart substation operation and maintenance.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 4th National Conference on Electrical, Electronics and Computer Engineering
Series
Advances in Engineering Research
Publication Date
December 2015
ISBN
10.2991/nceece-15.2016.69
ISSN
2352-5401
DOI
10.2991/nceece-15.2016.69How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Wang Lei
AU  - Li Jin
PY  - 2015/12
DA  - 2015/12
TI  - Rapid Testing Method of New Generation Smart Substation Network Configuration
BT  - Proceedings of the 2015 4th National Conference on Electrical, Electronics and Computer Engineering
PB  - Atlantis Press
SP  - 349
EP  - 353
SN  - 2352-5401
UR  - https://doi.org/10.2991/nceece-15.2016.69
DO  - 10.2991/nceece-15.2016.69
ID  - Lei2015/12
ER  -