Proceedings of the 7th International Conference on Management, Education, Information and Control (MEICI 2017)

Experimental Study on Gas Outburst Removal by Cross-seam Holes Pre-drilling Gas Drainage in Floor Roadway

Authors
Peng Zhang, Yongjiang Zhang
Corresponding Author
Peng Zhang
Available Online October 2017.
DOI
10.2991/meici-17.2017.166How to use a DOI?
Keywords
Crossing hole; Drainage outburst elimination; Low permeability coal seam; Bottom lane; Coal lane strip
Abstract

Because of China's coal mine gas disaster is serious, for a single outburst low permeability coal seam,pre-drilling gas drainage by cross-seam holes is the main means  to solving the gas disaster . Aiming at the problem of the coal roadway strip and the working face outburst removal, the experimental study on cross-seam holes pre-drilling gas drainage in floor roadway. The evolution law of gas pressure along with the extraction time is analyzed, the key parameters of the best extraction efficiency are obtained. The experiment was carried out in the test mine, The research shows that cross-seam holes pre-drilling gas drainage in floor roadway effectively solve the outburst problems without protective layer mining and single coal seam, and achieved remarkable results, the coal roadway safety belt tunneling and mining face, which plays an important role.

Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 7th International Conference on Management, Education, Information and Control (MEICI 2017)
Series
Advances in Intelligent Systems Research
Publication Date
October 2017
ISBN
10.2991/meici-17.2017.166
ISSN
1951-6851
DOI
10.2991/meici-17.2017.166How to use a DOI?
Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Peng Zhang
AU  - Yongjiang Zhang
PY  - 2017/10
DA  - 2017/10
TI  - Experimental Study on Gas Outburst Removal by Cross-seam Holes Pre-drilling Gas Drainage in Floor Roadway
BT  - Proceedings of the 7th International Conference on Management, Education, Information and Control (MEICI 2017)
PB  - Atlantis Press
SP  - 836
EP  - 840
SN  - 1951-6851
UR  - https://doi.org/10.2991/meici-17.2017.166
DO  - 10.2991/meici-17.2017.166
ID  - Zhang2017/10
ER  -