Proceedings of the 2015 International Conference on Mechatronics, Electronic, Industrial and Control Engineering

Dump Design and Stability Analysis of Jinping Bay river Iron ore on Yunnan province

Authors
Xiaobin Huai, Deyong Huang, Wei Ma
Corresponding Author
Xiaobin Huai
Available Online April 2015.
DOI
10.2991/meic-15.2015.107How to use a DOI?
Keywords
dump design; stability; Iron ore;safety;analysis
Abstract

This paper discusses a programming problem with dump design in Bay river iron on Yunnan province. In order to solve the problem efficiently, Firstly we analysis the conditions about the geological, then design the dump of Jinping Bayriver iron on Yunnan province. However, the stability is very important for it, so we must evaluate the stability After calculation, indicating that the dump is stable . Dump stability computations premise is original geological terrain slope below the slip plane does not exist, design thought should also be considered in the proof of groundwater erosion, but because of the extent of the impact is difficult to make a judgment according to the available information, Calculated, assuming a potential slip plane "ABCF" stability factor FS2 = 1.31> [FS] = 1.15 ~ 1.30, indicating that the assumptions underlying the slip plane "ABCF" does not exist, is stable.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International Conference on Mechatronics, Electronic, Industrial and Control Engineering
Series
Advances in Engineering Research
Publication Date
April 2015
ISBN
978-94-62520-62-2
ISSN
2352-5401
DOI
10.2991/meic-15.2015.107How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Xiaobin Huai
AU  - Deyong Huang
AU  - Wei Ma
PY  - 2015/04
DA  - 2015/04
TI  - Dump Design and Stability Analysis of Jinping Bay river Iron ore on Yunnan province
BT  - Proceedings of the 2015 International Conference on Mechatronics, Electronic, Industrial and Control Engineering
PB  - Atlantis Press
SP  - 462
EP  - 465
SN  - 2352-5401
UR  - https://doi.org/10.2991/meic-15.2015.107
DO  - 10.2991/meic-15.2015.107
ID  - Huai2015/04
ER  -