Simulation Analysis of Feisha Reinforced Concrete U-shaped Section Aqueduct
- DOI
- 10.2991/meic-14.2014.265How to use a DOI?
- Keywords
- Reinforced concrete aqueduct; Finite element method; Simulation analysis; Stress distribution; Calculation model.
- Abstract
Feisha aqueduct is located at west main canal of irrigation district in the Xinjin county, Liaoning province, the aqueduct is reinforced concrete rib arch aqueduct, arch centering is variable cross-section reinforced concrete double rib structure, arch axis is parabola, clear span is 33 m, rise-span ratio is 1/3. Aqueduct is a important conveyance structure, this paper uses three dimensional finite element method to simulate and analyse Feisha reinforced concrete U-shaped section aqueduct, and researchs stress and deformation distribution of aqueduct during construction and operation period. Research results show that Feisha reinforced concrete U-shaped section aqueduct structure is reasonable, stressing definite, can satisfy engineering requirement. Feisha aqueduct adopts reinforced concrete rib arch scheme is reasonable. Aqueduct structure is stressing definite, simple, convenient for construction. Vertical displacement of aqueduct structure is small, can meet stiffness requirement.
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Dongyu Ji AU - Zhichao Yang PY - 2014/11 DA - 2014/11 TI - Simulation Analysis of Feisha Reinforced Concrete U-shaped Section Aqueduct BT - Proceedings of the 2014 International Conference on Mechatronics, Electronic, Industrial and Control Engineering PB - Atlantis Press SP - 1185 EP - 1188 SN - 2352-5401 UR - https://doi.org/10.2991/meic-14.2014.265 DO - 10.2991/meic-14.2014.265 ID - Ji2014/11 ER -