Production Rate Regression Model of Railway Construction Project based on Grid
- DOI
- 10.2991/mecae-17.2017.13How to use a DOI?
- Keywords
- Railway construction project, Time-space grid, Production rate regression model.
- Abstract
Project schedule has been regarded as the core work of the project management. Scheduling and using the project schedule scientifically and reasonably is the key to ensure the organization work of construction project orderly. In this paper, the time-location-based division method of influencing factors has been developed according to their time-spatial varying features. The paper has collected the actual construction progress data and taken use of multiple linear regression analysis determining the incidence relation between the production rates and influence factors. Then the regression model with varying production rates based on grids could be developed. Finally, the practical schedule data of railway Wu Caiwan-Jiang Junmiao sectional subgrade engineering has been utilized to verify the validity of the model.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Wenrui Ren AU - Renkui Liu AU - Futian Wang AU - Mengyi Sun PY - 2017/03 DA - 2017/03 TI - Production Rate Regression Model of Railway Construction Project based on Grid BT - Proceedings of the 2017 International Conference on Mechanical, Electronic, Control and Automation Engineering (MECAE 2017) PB - Atlantis Press SP - 72 EP - 77 SN - 2352-5401 UR - https://doi.org/10.2991/mecae-17.2017.13 DO - 10.2991/mecae-17.2017.13 ID - Ren2017/03 ER -