Proceedings of the VIth International Workshop 'Critical Infrastructures: Contingency Management, Intelligent, Agent-Based, Cloud Computing and Cyber Security' (IWCI 2019)

Output Forms for Calculation Results in the Computing & Geo-Information System

Authors
Ivan Trofimov, Leonid Trofimov, Lyudmila Chudinova, Sergei Podkovalnikov
Corresponding Author
Ivan Trofimov
Available Online September 2019.
DOI
https://doi.org/10.2991/iwci-19.2019.5How to use a DOI?
Keywords
computing system; geo-information system; optimization model; data processing; object database; power plant; power system; interstate power interconnection
Abstract
The paper discusses about special Computing and Geo-Information System with Object-Oriented Energy Database. The System is used to carries out the research of feasibility and prospects of Interstate Power Interconnection expansion. For this purpose, the mathematical model for Optimization of Power Systems Expansion and Operating Modes, which is the main part of the System, is used. An interface for working with the Model is developed. The output forms for calculation results by the Model in tabular, graphic and cartographic forms are presented.
Open Access
This is an open access article distributed under the CC BY-NC license.

Download article (PDF)

Cite this article

TY  - CONF
AU  - Ivan Trofimov
AU  - Leonid Trofimov
AU  - Lyudmila Chudinova
AU  - Sergei Podkovalnikov
PY  - 2019/09
DA  - 2019/09
TI  - Output Forms for Calculation Results in the Computing & Geo-Information System
BT  - VIth International Workshop 'Critical Infrastructures: Contingency Management, Intelligent, Agent-Based, Cloud Computing and Cyber Security' (IWCI 2019)
PB  - Atlantis Press
SP  - 25
EP  - 29
SN  - 1951-6851
UR  - https://doi.org/10.2991/iwci-19.2019.5
DO  - https://doi.org/10.2991/iwci-19.2019.5
ID  - Trofimov2019/09
ER  -