Control of Upstream Bekasi River Floods by Building a Dry Dam Series in Cikeas River and Cileungsi River, West Java
- DOI
- 10.2991/aer.k.201221.068How to use a DOI?
- Keywords
- flood discharge, flood control, dry dam series
- Abstract
The Upstream Bekasi River flood covering an area of 326 ha in 15 inundation points covers five sub-districts of Bekasi City. The Upstream Bekasi River has 2 (two) tributaries, namely Cikeas River and Cileungsi River. The Upstream Bekasi River flood was caused by a relatively small cross-sectional capacity of the river, namely 391.79 m3/s, while the flood discharge that occurred was relatively enormous, namely 708.75 m3/s. The flood was caused by the Cikeas River at 199.47 m3/s and the Cileungsi River at 509.28 m3/s. In order to control floods in Upstream Bekasi River, a dry dam series is planned in Cikeas River and Cileungsi River. At Cikeas River, the Ck-227 weir was built, while at the Cileungsi River the Cl-1 weir was built. The methods used consist of data collection (rain, map of the earth; and the topography of Cikeas and Cileungsi River and the capacity of Upstream Bekasi River), determining the flood discharge design for Cikeas River and Cileungsi River, determining the location; high; the number and dimensions of the weir outlet doors, as well as the flood simulation until the Cikeas River discharge + the Cileungsi River discharge < Bekasi Hulu River discharge. Based on the results of the flood simulation, it is found that at the Cl-1 dam, with the input of the peak flood discharge of 509.28 m3/s, the peak flood output becomes 198.40 m3/s. While at the CK-227 Dam, with a peak flood discharge input of 199.47 m3/s, the peak flood output is 170.40 m3/s. The simulated flood discharge of Cikeas River and Cileungsi River is 368.80 m3/s, smaller than the channel capacity of the Upstream Bekasi River, which is 391.79 m3/s. So it can be concluded that the flood in Upstream Bekasi River can be controlled by building dry dam series in Cikeas River and Cileungsi River.
- Copyright
- © 2020, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Edy Sriyono AU - Ilham Purnomo AU - Tania Edna Bhakty AU - Azhari PY - 2020 DA - 2020/12/22 TI - Control of Upstream Bekasi River Floods by Building a Dry Dam Series in Cikeas River and Cileungsi River, West Java BT - Proceedings of the International Seminar of Science and Applied Technology (ISSAT 2020) PB - Atlantis Press SP - 415 EP - 421 SN - 2352-5401 UR - https://doi.org/10.2991/aer.k.201221.068 DO - 10.2991/aer.k.201221.068 ID - Sriyono2020 ER -