The Method of Shortening Transformer DC Resistance Test Time
- DOI
- 10.2991/isrme-15.2015.423How to use a DOI?
- Keywords
- transformer, the test efficiency, DC resistance, remanence
- Abstract
Transformer DC resistance test is one of the routine test in the transformer core project, but the test efficiency is generally low.The paper ,through the analysis of transient process of large DC resistance measurement of transformer coil, core hysteresis phenomenon and the influence of residual magnetism on the measurement process.Improve the working principle, a method of fast measurement, large transformer DC resistance does not increase ,in other devices,characteristics of combination of YNd11 connection of three-phase transformer testing instrument and physical characteristics of the proposes. Field test proves that this method effectively utilizes the remanence, can get the main transformer winding DC resistance test results quickly and accurately.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Chuanzong Zhao AU - Lishuai He AU - Bo Liu AU - Chuang Wang AU - Shuo Cheng AU - Yanhai Huang AU - Chuanbo Liu AU - Yang Hu AU - Xinyu Li AU - Yanjun Pang AU - Qinghao Wang PY - 2015/04 DA - 2015/04 TI - The Method of Shortening Transformer DC Resistance Test Time BT - Proceedings of the 2015 International Conference on Intelligent Systems Research and Mechatronics Engineering PB - Atlantis Press SP - 2044 EP - 2047 SN - 1951-6851 UR - https://doi.org/10.2991/isrme-15.2015.423 DO - 10.2991/isrme-15.2015.423 ID - Zhao2015/04 ER -