Research on Reform Requirements to and Reform Path of Power Grid Enterprise’ Collective Assets
- DOI
- 10.2991/assehr.k.200826.044How to use a DOI?
- Keywords
- power grid enterprise, collective assets, reform requirements, reform path
- Abstract
In 2019, the State-owned Assets Supervision and Administration Commission issued the “Notice on Accelerating the Relevant the Reform of the Central Enterprises’ Factory-owned Collective Enterprises” (SASAC Reform [2019] No. 20) to make further arrangements. The collective assets of power grid enterprises are faced with the multiple requirements of the reform of factory-owned collective enterprises, the reform of state-owned assets and state-owned enterprises, and the reform of the electric power system. Based on the analysis of the latest reform requirements, this study clarifies the the main problems existing in the reform and development of power grid enterprise’ collective assets and related enterprises, and the uniqueness of the deepening reform in terms of basic conditions and constraints, thereby proposing multiple considerations for goal of deepening reform, and the path of thinking in the near and long-term reform.
- Copyright
- © 2020, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Sun Lichun AU - Zhang Hualei PY - 2020 DA - 2020/08/28 TI - Research on Reform Requirements to and Reform Path of Power Grid Enterprise’ Collective Assets BT - Proceedings of the 2020 4th International Seminar on Education, Management and Social Sciences (ISEMSS 2020) PB - Atlantis Press SP - 218 EP - 221 SN - 2352-5398 UR - https://doi.org/10.2991/assehr.k.200826.044 DO - 10.2991/assehr.k.200826.044 ID - Lichun2020 ER -