Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017)

Strategy in the Trial-production Phase of HIGGS Watch

Authors
Youxia Sun, Jinliang Li
Corresponding Author
Youxia Sun
Available Online February 2018.
DOI
10.2991/ifeesm-17.2018.299How to use a DOI?
Keywords
trial-production, process optimization, management control
Abstract

The paper discussed the problems in trial-production line for the HIGGS watch, which made against the success of putting the new product into mass production smoothly and introducing it to the consumer market on schedule. After analyzing the causes of the problems, a series of solutions such as communication with customers, process optimization, jig improvement, optimal allocation of machines and operators, introduction of automatic machine and means of management control were put forward.

Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017)
Series
Advances in Engineering Research
Publication Date
February 2018
ISBN
978-94-6252-453-8
ISSN
2352-5401
DOI
10.2991/ifeesm-17.2018.299How to use a DOI?
Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Youxia Sun
AU  - Jinliang Li
PY  - 2018/02
DA  - 2018/02
TI  - Strategy in the Trial-production Phase of HIGGS Watch
BT  - Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017)
PB  - Atlantis Press
SP  - 1644
EP  - 1647
SN  - 2352-5401
UR  - https://doi.org/10.2991/ifeesm-17.2018.299
DO  - 10.2991/ifeesm-17.2018.299
ID  - Sun2018/02
ER  -