Design and Simulation of On-Grid Solar Power Plant for the Power Needs of PPI Madiun Crossing Gate
- DOI
- 10.2991/978-94-6463-384-9_23How to use a DOI?
- Keywords
- Level Crossing; On-Grid Solar Power; Design Configuration; Homer Pro
- Abstract
At PPI Madiun, the power supply system to operate the level crossing doorstop is currently still dependent on electricity from PLN. However, to reduce dependence on electrical energy from PLN as recommended by the Minister of Energy and Mineral Resources (ESDM) and the Director of PPI Madiun, the abundant potential of renewable energy in Indonesia can be utilized. The potential for sunlight in Madiun reaches 5,446 kWh/m2/day. Therefore, it is proposed to use an On-Grid solar power plant (PLTS) with a certain configuration connected in series. The system uses a 5.5 kWh Inverter to convert DC electricity into AC. LEONI 4mm (100m) and AWG (50m) type cables connect the components. A 230 Vac ATS with 2 sources manages the power supply, and a converter is required to convert AC loads to DC (230 Vac capacity to 24 Vdc). The solar panel installation area is 15.6 m2. Simulation results with Homer Pro show the On-Grid Solar PV design is capable of generating 4,778 kWh/year, exceeding the daily requirement of 4,776 kWh for doorstop operation. The total cost for the implementation of On-Grid Solar Power at level crossing PPI Madiun is Rp.103,808,213. With the adoption of this system, PPI Madiun can reduce dependence on PLN and switch to renewable energy that is more environmentally friendly.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Asep Dwi Pandurisnawan AU - Natriya Faisal Rachman AU - Santi Tri Wijaya AU - Sunardi Sunardi PY - 2024 DA - 2024/02/20 TI - Design and Simulation of On-Grid Solar Power Plant for the Power Needs of PPI Madiun Crossing Gate BT - Proceedings of the 2nd International Conference on Railway and Transportation 2023 (ICORT 2023) PB - Atlantis Press SP - 260 EP - 271 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-384-9_23 DO - 10.2991/978-94-6463-384-9_23 ID - Pandurisnawan2024 ER -