Proceedings of the 2nd International Conference on Railway and Transportation 2023 (ICORT 2023)

Risk Management of Box Culvert Construction Work at Bh 1149 Cross Cirebon - Kroya with Failure Mode and Effect Analysis and Fault Tree Analysis Method

Authors
Puspita Dewi1, Septiana Widi Astuti1, *, Elvina Royani Tiana Putri1
1Construction and Railways Technology, Politeknik Perkeretaapian Indonesia, Madiun, Indonesia
*Corresponding author. Email: septiana@ppi.ac.id
Corresponding Author
Septiana Widi Astuti
Available Online 20 February 2024.
DOI
10.2991/978-94-6463-384-9_13How to use a DOI?
Keywords
Risk Management; Failure Mode and Effect Analysis (FMEA); Fault Tree Analysis (FTA); Occupational Health and Safety (OHS); Box Culvert
Abstract

One of the efforts made by the government in improving the quality of infrastructure is the replacement of armco to box culvert at BH 1149 between Linggapura Station - Bumiayu Station on the Cirebon - Kroya crossing. The purpose of this study is to determine the potential risks that exist during the construction process. The analysis was carried out using the Failure Mode and Effect Analysis (FMEA) and Fault Tree Analysis (FTA) methods to determine the causal factors of the risk occurrence by depicting the failure tree. The results of this analysis showed that there were 67 risk variables from the construction project and obtained the 6 highest risk variables from each work group namely slings cut off in material procurement work with an RPN value of 86,838, excavator rolled over in preparation work with a value of 82,811, heavy equipment damage in railroad bridge work with an RPN value of 83,741, punctured/scratched/tripped on box culvert work with an RPN value of 70,272, slipped on track work with an RPN value of 12,938, mired in retaining wall work with an RPN value of 55,594. In handling and preventing potential work accidents, the role of contractors and workers is very influential in reducing the number of incidents. Contractors can conduct regular evaluations of risk control and workers are required to comply with existing regulations regarding Occupational Health and Safety. Thus, a safe and comfortable workplace for workers will be obtained.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2nd International Conference on Railway and Transportation 2023 (ICORT 2023)
Series
Advances in Engineering Research
Publication Date
20 February 2024
ISBN
10.2991/978-94-6463-384-9_13
ISSN
2352-5401
DOI
10.2991/978-94-6463-384-9_13How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Puspita Dewi
AU  - Septiana Widi Astuti
AU  - Elvina Royani Tiana Putri
PY  - 2024
DA  - 2024/02/20
TI  - Risk Management of Box Culvert Construction Work at Bh 1149 Cross Cirebon - Kroya with Failure Mode and Effect Analysis and Fault Tree Analysis Method
BT  - Proceedings of the 2nd International Conference on Railway and Transportation 2023 (ICORT 2023)
PB  - Atlantis Press
SP  - 139
EP  - 153
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-384-9_13
DO  - 10.2991/978-94-6463-384-9_13
ID  - Dewi2024
ER  -