Cost Comparison Analysis of Fence Work Between Conventional Walls and Pracest Concrete (Case Study of West Java Petrochemical Complex Project) at PT Pertamina International
- DOI
- 10.2991/978-94-6463-406-8_20How to use a DOI?
- Keywords
- Conventional; Concrete Fence; Cost Comparison; Precast (key words)
- Abstract
The fence is one of the important components in a building which functions as an area barrier, protects privatization, protects security (safety), art and beauty of the building being fenced, generally fences are made of concrete, brick, steel, stainless steel, live plants, wood / planks and river stones. The fence work was carried out using two work methods, namely using the precast concrete method and the hebel or light brick wall method. This research aims to determine the price of work and the duration of work on fences between precast concrete using two different grades of concrete using conventional methods (light brick wall installation) as well as the methods recommended in terms of cost and time The construction period of precast wall installation is shorter than that of conventional wall installation. A precast wall project takes three months. While conventional walls take an average of four months. Precast walls feature practical modular installation methods as well as fabrication of Similar panel components. Conventional wall work (masonry) takes longer to perform compared to prefabricated walls. (Abstract).
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Dede Ahmad Yusuf AU - Andra Gerinta Prahasta AU - Tesan Peranata Pauzan AU - Dio Damas Permadi AU - Utamy Sukmayu Saputri PY - 2024 DA - 2024/05/13 TI - Cost Comparison Analysis of Fence Work Between Conventional Walls and Pracest Concrete (Case Study of West Java Petrochemical Complex Project) at PT Pertamina International BT - Proceedings of the 2nd International Conference on Consumer Technology and Engineering Innovation (ICONTENTION 2023) PB - Atlantis Press SP - 109 EP - 113 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-406-8_20 DO - 10.2991/978-94-6463-406-8_20 ID - Yusuf2024 ER -