Applying An Overlapped Design Schedule Based Dependency Structure Matrix to Minimize Project Makespan

Authors
Chao Ou-Yang, Indy Cesara
Corresponding Author
Chao Ou-Yang
Available Online March 2019.
DOI
10.2991/icoiese-18.2019.33How to use a DOI?
Keywords
human resources allocation; project makespan; dependency structure matrix; worker cluster; overlapped design process; rework time
Abstract

Design process scheduling is conducted by optimizing human resources or workers allocation to several tasks in project with several real constraints to achieve the objective, minimizing the project makespan. In real business case, despite the tasks are already allocated to the optimal workers, rework still can happen because of the uncertainty. The rework can lead to unexpected extra time consumption. To anticipate this unexpected problem, tasks overlapping method is proposed in this research to reduce the project makespan after worker allocation. However the task overlapping method has a drawback, it requires more coordination and interaction between workers who conduct each of overlapping tasks. This research emphasize overlapped design schedule in a design process based on worker cluster from Dependency Structure Matrix (DSM). Worker DSM is used to encounter the task overlapping’s drawback. Workers who come from same cluster have more coordination and interaction to each other. It is expected workers who assigned on tasks overlapped are from same cluster. This research’s intention is to provide the workers allocation to obtain optimal project makespan result and create worker clustering from worker-DSM to identify the tasks that can be overlapped in design process. It is also expected to show the possible rework time from tasks overlapping’s reduction time.

Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2018 International Conference on Industrial Enterprise and System Engineering (IcoIESE 2018)
Series
Atlantis Highlights in Engineering
Publication Date
March 2019
ISBN
10.2991/icoiese-18.2019.33
ISSN
2589-4943
DOI
10.2991/icoiese-18.2019.33How to use a DOI?
Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Chao Ou-Yang
AU  - Indy Cesara
PY  - 2019/03
DA  - 2019/03
TI  - Applying An Overlapped Design Schedule Based Dependency Structure Matrix to Minimize Project Makespan
BT  - Proceedings of the 2018 International Conference on Industrial Enterprise and System Engineering (IcoIESE 2018)
PB  - Atlantis Press
SP  - 183
EP  - 188
SN  - 2589-4943
UR  - https://doi.org/10.2991/icoiese-18.2019.33
DO  - 10.2991/icoiese-18.2019.33
ID  - Ou-Yang2019/03
ER  -