Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control

Development on Construction Project Cost System Based on Spring

Authors
Nannan Zhang, Wanqing Yang
Corresponding Author
Nannan Zhang
Available Online April 2016.
DOI
10.2991/icmemtc-16.2016.345How to use a DOI?
Keywords
Spring; processing flow; construction project; cost system; development; system functional design;
Abstract

Spring is to solve the common problem in many J2EE development, and can replace strong lightweight framework in the EJB technology. Based on Spring development construction project cost system, to improve the competitiveness of building enterprise and information technology services. First of all, based on the Spring framework structure, the Spring MVC request processing process; Then, following the abstract and incremental refinement, the principle of modularity and information hiding, designed by the six main function modules of the system; Finally, using the JDBC method to design the data access, including entity class structure and write two steps to implement the DAO. The research achievements of this paper to solve the key technical problems in the software development process, the actual development process to exert the advantages of Spring, to avoid the shortcomings, in order to improve the software performance.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control
Series
Advances in Engineering Research
Publication Date
April 2016
ISBN
978-94-6252-173-5
ISSN
2352-5401
DOI
10.2991/icmemtc-16.2016.345How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Nannan Zhang
AU  - Wanqing Yang
PY  - 2016/04
DA  - 2016/04
TI  - Development on Construction Project Cost System Based on Spring
BT  - Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control
PB  - Atlantis Press
SP  - 1834
EP  - 1839
SN  - 2352-5401
UR  - https://doi.org/10.2991/icmemtc-16.2016.345
DO  - 10.2991/icmemtc-16.2016.345
ID  - Zhang2016/04
ER  -