Optimization Model of Resources Reallocation for Project Group under the Precondition of Resources Supply Scarcity

Authors
Chunguang Chang, Minghao Qi, Jingyu Luo, Shuang Yang
Corresponding Author
Chunguang Chang
Available Online July 2015.
DOI
10.2991/icimm-15.2015.147How to use a DOI?
Keywords
Construction management; Project group; Optimization model; Resource reallocation
Abstract

The construction process of project group is full of uncertain factors, large numbers of resources are required, and it is easy to lack of certain resources. Based on programming theory, the project group resource reallocation optimization model is established when supplied resource quantities are insufficient. By applying programming theory, a linear programming model including labor, material resource reallocation is established, it regards the shortest delaying construction period and minimum extra increased cost as the objective function. It guarantees the rational reallocation of resources. Through actual example analysis, how to optimize the configuration of the actual project group when the situation in which insufficient resources supply occurs is vadilated.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials
Series
Advances in Engineering Research
Publication Date
July 2015
ISBN
10.2991/icimm-15.2015.147
ISSN
2352-5401
DOI
10.2991/icimm-15.2015.147How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Chunguang Chang
AU  - Minghao Qi
AU  - Jingyu Luo
AU  - Shuang Yang
PY  - 2015/07
DA  - 2015/07
TI  - Optimization Model of Resources Reallocation for Project Group under the Precondition of Resources Supply Scarcity
BT  - Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials
PB  - Atlantis Press
SP  - 783
EP  - 789
SN  - 2352-5401
UR  - https://doi.org/10.2991/icimm-15.2015.147
DO  - 10.2991/icimm-15.2015.147
ID  - Chang2015/07
ER  -