Research on the Cost of the Whole Life Cycle of the Transformer
- DOI
- 10.2991/iceemt-16.2016.99How to use a DOI?
- Keywords
- Full life cycle, case, modeling, analysis
- Abstract
To solve the current energy supply and demand tension grid must intelligent control to the operation of the equipment, at the same time, to look for a new management model, to maximize energy efficiency, to achieve energy-saving power grid. Transformer is the most important power equipment, domestic study on transformer life currently mainly concentrated in the transformer life cycle cost, type selection of transformer and the transformer economic operation. In this paper, we consider transformer in the demonstration, construction, operation, maintenance, fault, and maintenance until his retirement in the whole life process, the modeling, through an example analysis to estimate the life cycle energy consumption.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yong Yang AU - Jing-jing Zheng AU - Pei-dong Du AU - Jing Peng PY - 2016/08 DA - 2016/08 TI - Research on the Cost of the Whole Life Cycle of the Transformer BT - Proceedings of the 2016 International Conference on Education, E-learning and Management Technology PB - Atlantis Press SP - 513 EP - 518 SN - 2352-5398 UR - https://doi.org/10.2991/iceemt-16.2016.99 DO - 10.2991/iceemt-16.2016.99 ID - Yang2016/08 ER -