Proceedings of the International Conference on Economics and Banking 2015

Borda Application Of Selection Planning Scheduling Method In Dock Engineering Consultants In Central Sulawesi Province Indonesia

Authors
Siti Fatimah, Ahmad Laongko, Muzakir Tombolotutu
Corresponding Author
Siti Fatimah
Available Online May 2015.
DOI
10.2991/iceb-15.2015.51How to use a DOI?
Keywords
CPM, PERT, PDM, S-Curve, Bar Chart, and Free Flat
Abstract

Purpose : The aim of this paper to find out the planning scheduling method that used in dock engineering consultants as a project supervisor dock. Design/Methodology/Approach: This research use qualitative approach to find the most preferred method by engineering consultants, this research was explorative that test and find out the most preferred method. Result: This research showed that dock engineering consultants in Palu City, Central Sulawesi most preferred curve-s method than method such as CPM, PERT, PDM, and Bar Chart. Practical Implication: This research can help further research to determine differences and similarities the project planning scheduling method and being basic for The New Dock Engineering Consultans. Originality/Value: This research looking for the most preferred method with limited respondents dock engineering consultans in Palu City, Central Sulawesi.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the International Conference on Economics and Banking 2015
Series
Advances in Economics, Business and Management Research
Publication Date
May 2015
ISBN
978-94-62520-86-8
ISSN
2352-5428
DOI
10.2991/iceb-15.2015.51How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Siti Fatimah
AU  - Ahmad Laongko
AU  - Muzakir Tombolotutu
PY  - 2015/05
DA  - 2015/05
TI  - Borda Application Of Selection Planning Scheduling Method In Dock Engineering Consultants In Central Sulawesi Province Indonesia
BT  - Proceedings of the International Conference on Economics and Banking 2015
PB  - Atlantis Press
SP  - 361
EP  - 364
SN  - 2352-5428
UR  - https://doi.org/10.2991/iceb-15.2015.51
DO  - 10.2991/iceb-15.2015.51
ID  - Fatimah2015/05
ER  -