Proceedings of the 2nd International Conference on Computer Science and Electronics Engineering (ICCSEE 2013)

Series-parallel combined constant pressure water supply pipeline design of high-rise building

Authors
Shilei Li, Hui Chen, Qiang Wang
Corresponding Author
Shilei Li
Available Online March 2013.
DOI
10.2991/iccsee.2013.786How to use a DOI?
Keywords
high-rise building, water supply pipelines, series-parallel combined, PLC
Abstract

The existing parallel type pressurized water supply pipeline of high-rise buildings has been improved to build energy-saving high-rise building water supply systems. Series-parallel combined constant pressure water supply pipeline is designed. Antipollution high water tank is reasonably installed above the middle area of the building to supply water for the middle area high water tank and supply pressurized water by water pumps for high-rise district. And PLC control system is designed to control the work efficiency of the water pumps according to the sensor feedback information. Verified by calculation and simulation, series-parallel combined constant pressure water supply pipeline is better than parallel water supply pipes in saving the energy which is about the middle-Hybrid phase consumption of the latter. PLC control is simulated and the results show that PLC can effectively control the water supply system to ensure stable water pressure so as to save energy.

Copyright
© 2013, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2nd International Conference on Computer Science and Electronics Engineering (ICCSEE 2013)
Series
Advances in Intelligent Systems Research
Publication Date
March 2013
ISBN
978-90-78677-61-1
ISSN
1951-6851
DOI
10.2991/iccsee.2013.786How to use a DOI?
Copyright
© 2013, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Shilei Li
AU  - Hui Chen
AU  - Qiang Wang
PY  - 2013/03
DA  - 2013/03
TI  - Series-parallel combined constant pressure water supply pipeline design of high-rise building
BT  - Proceedings of the 2nd International Conference on Computer Science and Electronics Engineering (ICCSEE 2013)
PB  - Atlantis Press
SP  - 2962
EP  - 2966
SN  - 1951-6851
UR  - https://doi.org/10.2991/iccsee.2013.786
DO  - 10.2991/iccsee.2013.786
ID  - Li2013/03
ER  -