Manpower Optimisation Needs with Workload Approach Using NASA-TLX Method on Ship Reparation
- DOI
- 10.2991/icastss-19.2019.68How to use a DOI?
- Keywords
- workload, standard time, NASA-TLX, full time equivalent
- Abstract
One of many things that could help the company to achieve their goals is a good human resource planning. The right calculation to optimize the manpower needs can make a company be more effective, efficient, and productive in finishing their works. In contrast, to increase productivity, the workload would be increasing too. KM. Asia Putra reparation in PT. Adiluhung Saranasegara Indonesia will be used as the object of this research because the project is considered to experience a long delay. The main purpose of this study is to provide recommendations for recruiting more manpower with a workload approach. The method that chosen is NASA-TLX which is a method that calculate workload subjectively. The result from NASA-TLX method recommends the company to add 35 more manpower to reach the optimal number for ship reparation process. With the recommendation, the schedule of ships reparation that was first planned for 25 days could be reduced 18 days. This study has a limitation in the field of cost that could be used as an object for further research.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Nurul Noviandani AU - Arie Indartono AU - Fitri Hardiyanti PY - 2019/10 DA - 2019/10 TI - Manpower Optimisation Needs with Workload Approach Using NASA-TLX Method on Ship Reparation BT - Proceedings of the International Conference On Applied Science and Technology 2019 - Social Sciences Track (iCASTSS 2019) PB - Atlantis Press SP - 77 EP - 80 SN - 2352-5398 UR - https://doi.org/10.2991/icastss-19.2019.68 DO - 10.2991/icastss-19.2019.68 ID - Noviandani2019/10 ER -