Research of Synchronous Jacking up Construction Monitoring and Control Technologies of Bridge
Authors
Jia He, Xingzan Gao
Corresponding Author
Jia He
Available Online November 2016.
- DOI
- 10.2991/icache-16.2016.7How to use a DOI?
- Keywords
- Synchronous Jacking up, Monitoring and Control, Simulation
- Abstract
This study is to optimize the longitudinal linear of the original route based on the jacking up construction of one bridge in the Xiamen-Chengdu Expressway project, which applied the synchronous jacking up construction method to raise the beam and consequently achieve the designed linear. Through the research of the jacking up technology, the synchronous jacking up construction monitoring and control technologies during the whole process of the construction as well as simulate the limit force of the beam by means of finite element software, the accurate analyzing threshold could be offered to the monitoring step.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jia He AU - Xingzan Gao PY - 2016/11 DA - 2016/11 TI - Research of Synchronous Jacking up Construction Monitoring and Control Technologies of Bridge BT - Proceedings of the 2016 2nd International Conference on Architectural, Civil and Hydraulics Engineering (ICACHE 2016) PB - Atlantis Press SP - 39 EP - 44 SN - 2352-5401 UR - https://doi.org/10.2991/icache-16.2016.7 DO - 10.2991/icache-16.2016.7 ID - He2016/11 ER -