Keypoint Analysis of the Pre-settlement Audit Work of the Construction project cost

Authors
Jinbao Cao, Yunzhu Liu, Jian Tang
Corresponding Author
Jinbao Cao
Available Online August 2015.
DOI
10.2991/ic3me-15.2015.116How to use a DOI?
Keywords
The analytical solution scheme of the problem of thepre settlement audit work of the construction project cost
Abstract

The pre settlement audit work of the construction project cost is a key job in the construction engineering, and is also the most basic work in building engineering. The pre settlement audit work of the construction project cost is the key to the cost control of construction engineering. Economic globalization brings new opportunities to every industry, but also proposes new requirementsto the development of every industry and increases the market competition.Facing the fierce market competition,if the construction industry wants to have a sustained and stable development, it is necessary to have a strict control of the cost of construction project.The pre settlement audit work of the construction project cost has an important impact on the cost of construction project, but at present there are many problems in the pre settlement audit work of the construction project cost in our country, which has seriously hindered the long-term development of China's construction industry. Therefore, this paper firstly gives a brief introduction to the pre settlement audit work of the construction project cost, and has a further analysis of the problems in thepresettlement audit work of the construction project cost, and finally puts forward the corresponding measures, hoping to help to improve the current situation of the pre settlement audit work of the construction project cost in our country and promote the the further development of China's construction industry.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 3rd International Conference on Material, Mechanical and Manufacturing Engineering
Series
Advances in Engineering Research
Publication Date
August 2015
ISBN
978-94-6252-100-1
ISSN
2352-5401
DOI
10.2991/ic3me-15.2015.116How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Jinbao Cao
AU  - Yunzhu Liu
AU  - Jian Tang
PY  - 2015/08
DA  - 2015/08
TI  - Keypoint Analysis of the Pre-settlement Audit Work of the Construction project cost
BT  - Proceedings of the 3rd International Conference on Material, Mechanical and Manufacturing Engineering
PB  - Atlantis Press
SP  - 588
EP  - 591
SN  - 2352-5401
UR  - https://doi.org/10.2991/ic3me-15.2015.116
DO  - 10.2991/ic3me-15.2015.116
ID  - Cao2015/08
ER  -