Proceedings of the 2023 5th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2023)

Design and Construction of the Interlocking Steel Pipe Pile Cofferdam for the Main Pier of the Shuidu Second Bridge located in Danjiangkou City

Authors
Qing Tian1, *, Tao Zhou1, Dengwu Li2, Hao Ge3
1Changjiang Institute of Survey, Planning, Design and Research, Wuhan, Hubei province, 430010, People’s Republic of China
2Hubei Provincial Road & Bridge Group Co., LTD., Wuhan, Hubei province, 430056, People’s Republic of China
3School of Civil Engineering and Architectural, Guangxi University, Nanning, Guangxi province, 530004, People’s Republic of China
*Corresponding author. Email: 176528463@qq.com
Corresponding Author
Qing Tian
Available Online 24 April 2024.
DOI
10.2991/978-94-6463-398-6_30How to use a DOI?
Keywords
lock buckle steel pipe pile; cofferdam; underwater construction; water sealing
Abstract

The main bridge of the Danjiangkou Shuidu Second Bridge is a three-span continuous steel box girder arch bridge with a total length of (227.5+225+227.5) meters. The 20th pier of the bridge is located in the main channel of the Han River. During the construction period, the designed water depth is approximately 9.5 m, requiring the installation of steel cofferdams for underwater construction. Considering the design conditions, a comparative analysis was conducted, and the decision was made to use interlocking steel pipe piles for the cofferdam. The cofferdam is arranged in a rectangular shape with a plan dimension of 44.06 m × 18.52 m and a height of 21 m. It employs Φ820×14 steel pipe piles, with 4 layers of internal support and a 3 m thick C30 underwater concrete base. Through analysis and calculations under different working conditions, the results indicate that the cofferdam structure is safe and reliable. The construction’s critical techniques for the interlocking steel pipe pile cofferdam are detailed in the description.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2023 5th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2023)
Series
Atlantis Highlights in Engineering
Publication Date
24 April 2024
ISBN
10.2991/978-94-6463-398-6_30
ISSN
2589-4943
DOI
10.2991/978-94-6463-398-6_30How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Qing Tian
AU  - Tao Zhou
AU  - Dengwu Li
AU  - Hao Ge
PY  - 2024
DA  - 2024/04/24
TI  - Design and Construction of the Interlocking Steel Pipe Pile Cofferdam for the Main Pier of the Shuidu Second Bridge located in Danjiangkou City
BT  - Proceedings of the 2023 5th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2023)
PB  - Atlantis Press
SP  - 302
EP  - 313
SN  - 2589-4943
UR  - https://doi.org/10.2991/978-94-6463-398-6_30
DO  - 10.2991/978-94-6463-398-6_30
ID  - Tian2024
ER  -