Integration of Artificial Intelligence in Building Construction Management: Optimizing Cost and Schedule
- DOI
- 10.2991/978-94-6463-398-6_50How to use a DOI?
- Keywords
- Construction; Construction plan; Sustainability; Artificial Intelligence (AI); Machine Learning; Optimization Algorithms
- Abstract
In the context of industrialization in the construction industry and the growing focus on carbon neutrality, the sector is rapidly shifting towards sustainability, digitalization, and the application of Artificial Intelligence (AI). This review explores current trends in this transformative landscape, with a focus on three key themes: machine learning, optimization algorithms, and AI in the Internet of Things (IoT). It highlights the benefits of using AI in construction and assesses its current state. The review also examines AI applications in various construction scenarios, including quality, cost, schedule control, and safety management, discussing advances and challenges in each area. It summarizes implementation issues and anticipates future directions for AI in construction. Additionally, a case study from a university experimental base is presented, demonstrating the use of AI algorithms, specifically the Particle Swarm Optimization (PSO) algorithm, to optimize construction project plans. This AI-driven approach effectively balances time and cost considerations, offering valuable insights for practical applications. Overall, this integrated approach bridges the gap between theory and real-world implementation, supporting interdisciplinary solutions that harness AI's potential to advance the construction industry and align with environmental sustainability goals.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Shengyu Liu PY - 2024 DA - 2024/04/24 TI - Integration of Artificial Intelligence in Building Construction Management: Optimizing Cost and Schedule BT - Proceedings of the 2023 5th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2023) PB - Atlantis Press SP - 525 EP - 532 SN - 2589-4943 UR - https://doi.org/10.2991/978-94-6463-398-6_50 DO - 10.2991/978-94-6463-398-6_50 ID - Liu2024 ER -