Proceedings of the 7th FIRST 2023 International Conference on Global Innovations (FIRST-ESCSI 2023)

Evaluation of Implementation of Mining Safety Management System at Pt Putra Muba Coal Sungai Lilin District Musi Banyuasin Regency South Sumatera Province

Authors
Lina Rianti1, *, Maria Puspa Sari1, Wina Aulia Putri1
1Coal Mining Engineering, Akamigas Polytechnic, Palembang, 30257, Indonesia
*Corresponding author. Email: linarianti@pap.ac.id
Corresponding Author
Lina Rianti
Available Online 27 February 2024.
DOI
10.2991/978-94-6463-386-3_51How to use a DOI?
Keywords
Risk; Mining Safety Management System; Discrepancy
Abstract

Mining Safety Management System (SMKP in Indonesia) is a part of management system in mining safety risk control consisting of mining operation safety and mining worker healt and safety as well as a guidance for mining companies in Indonesia in implementing mining safety management system. The evaluation of SMKP Minerba had been regulated in laws and regulation, namely the Director General of Mineral and decree No.K/37.04/DJB/2019, and the evaluation of SMKP Minerba implementation consist of 7 elements of SMKP. The aim of the study was to determine the level of assessment of SMKP implementation and to find out the results of suitability of SMKP implementation at PT Putra Muba Coal. The researh method used was a qualitative method. The results of the evaluation of SMKP Minerba implementation at PT Putra Muba Coal obtained a percentage value of 27% out of the standar value of 100%. Among the 7 elements the policy element was 3%, the planning elements was 4%, the organizational and personnel elements was 10%, the implementation element was 8%, elements of monitoring, evaluation and follow-up was 8%, elements of documentation was 1% and elements of management review and performance improvement was 5%. And from the assesment, it was found 88 findings of discrepancy and 7 findings of conformity. From the results of this assesments, the company obtained a level of achivement of implementation fulfillments with a poor category and the company must make improvements by implementing all elements of SMKP Minerba in order to get a good value.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 7th FIRST 2023 International Conference on Global Innovations (FIRST-ESCSI 2023)
Series
Advances in Engineering Research
Publication Date
27 February 2024
ISBN
978-94-6463-386-3
ISSN
2352-5401
DOI
10.2991/978-94-6463-386-3_51How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Lina Rianti
AU  - Maria Puspa Sari
AU  - Wina Aulia Putri
PY  - 2024
DA  - 2024/02/27
TI  - Evaluation of Implementation of Mining Safety Management System at Pt Putra Muba Coal Sungai Lilin District Musi Banyuasin Regency South Sumatera Province
BT  - Proceedings of the 7th FIRST 2023 International Conference on Global Innovations (FIRST-ESCSI 2023)
PB  - Atlantis Press
SP  - 499
EP  - 512
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-386-3_51
DO  - 10.2991/978-94-6463-386-3_51
ID  - Rianti2024
ER  -