Proceedings of the 2015 International Conference on Education Technology, Management and Humanities Science

Study on the three-dimensional structure description of implicit demand based on Incomplete Contracting Theory

Authors
Hua Liu, Jiyong Li
Corresponding Author
Hua Liu
Available Online March 2015.
DOI
https://doi.org/10.2991/etmhs-15.2015.185How to use a DOI?
Keywords
construction contract; implicit demand; explicit demand; incomplete contract theory.
Abstract
The paper puts forward the implicit demand of construction contract with the support of Incomplete Contracting Theory, and conducts a systematic study on it by building a model of which use "think", "say", "write" three dimensions from the perspective of human cognition and expressions. And further, defines the connotation of implicit demand of construction contract and classifies its performance models. This paper provides a new train of thought for the study of improving the efficiency of contract management.
Open Access
This is an open access article distributed under the CC BY-NC license.

Download article (PDF)

Cite this article

TY  - CONF
AU  - Hua Liu
AU  - Jiyong Li
PY  - 2015/03
DA  - 2015/03
TI  - Study on the three-dimensional structure description of implicit demand based on Incomplete Contracting Theory
BT  - 2015 International Conference on Education Technology, Management and Humanities Science (ETMHS 2015)
PB  - Atlantis Press
SP  - 842
EP  - 846
SN  - 2352-5398
UR  - https://doi.org/10.2991/etmhs-15.2015.185
DO  - https://doi.org/10.2991/etmhs-15.2015.185
ID  - Liu2015/03
ER  -